Sign In | Join Free | My china-telecommunications.com
China Pego Electronics (Yi Chun) Company Limited logo
Pego Electronics (Yi Chun) Company Limited
Pego Electronics-Focus on developing and promoting IEC lab testing equipments
Verified Supplier

7 Years

Home > Environment Test Equipment >

Thermal Shock Environment Electrical Test Equipment IEC60068-2-3 12 Months Warranty

Pego Electronics (Yi Chun) Company Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Thermal Shock Environment Electrical Test Equipment IEC60068-2-3 12 Months Warranty

Brand Name : PEGO GROUP

Model Number : PG-TSC

Certification : CE Certificate

Place of Origin : China

MOQ : 1 set

Price : USD10000~USD15000

Payment Terms : T/T, Western Union, MoneyGram

Delivery Time : 30 working days

Packaging Details : woodencase

Standard : MIL STD,GB,JIS,JEDEC,IEC60068-2-3

Type : three box type

Thermal shock range : -40℃~ +120℃

Material : stainless steel

Size : 60L, 80L, 100L, 120L (optional)

Warranty : 12 months

Working Power : AC380V, 50HZ

Control system : TEMI880N+LCD touch screen

Contact Now

IEC60068-2-3 Thermal Shock Environment Test Equipment from -40℃ to +120℃

1. Introduction

The thermal shock test chamber is divided into two-box type and three-box type. The difference is that the test method and internal structure are different. The product conforms to the standard: GB/T2423.1-2008 test A, GB/T2423.2-2008 test B, GB- T10592-2008, GJB150.3-198, GJB360A-96 Method 107 Requirements for temperature impact test. The thermal shock test chamber is an indispensable test equipment for the metal, plastic, rubber, electronics and other materials industries. It is used to test the degree to which a material structure or composite material can withstand in a transient environment of extremely high temperature and extremely low temperature. It is possible to detect chemical changes or physical damage caused by thermal expansion and contraction in the shortest time.

Standard:MIL STD,GB,JIS,JEDEC,IEC60068-2-3

2. Parameters:

● High temperature range: +80℃~ +200℃

● Low temperature range: -10℃~ -60℃

●Temperature cyclic range: -40℃~ +120℃

● Accuracy: ±2℃

● Resolution: 0.01℃

● Rising time at hot space: RT~150℃ <40mins

● Rising time at cold space: RT~-40℃ < 50mins

● Recover time at test space (-40℃~+120℃): 3~5 mins

● Weight of EUT: 5kg above

● Construction: high temperature chamber, low temperature chamber, test chamber

●Size option:

Interior Size W*D*H(mm)
60L 500*300*400
80L 400*400*500
100L 500*400*500
150L 500*500*600
3. Features

●Thermal insulation material:High-density glass wool and high strength PU foamed insulation

● High-low temperature automatic switching equipment

● Power supply: 3 phase 5 wires (AC380V, 50HZ)

● Workin conditions requred: 0℃~35℃, ≤85%R.H

● Equipment consists by: high temperature chamber, low temperature chamber, test chamber, control system, cooling system, heating system, air duct system, drainage system

● Control system: TEMI880N+LCD touch screen

4. Working Pricinple:

A. Low temperature storage room: The temperature state inside the tank is determined by the working state of the heater, evaporator and fan in the air duct. After the refrigerant flowing out through the expansion valve enters the evaporator in the working chamber, the heat in the working chamber is absorbed and vaporized, so that the temperature of the working chamber is lowered; the working fluid after gasification is sucked by the compressor and compressed into high temperature and high pressure gas into the condenser. The medium is condensed into a liquid, and after being screened, finally throttled by the expansion valve, and then re-entered into the evaporator of the working chamber to absorb heat and vaporize and then be sucked and compressed by the compressor. So reciprocating loop work, the studio temperature is lowered to the set temperature requirements.

B. High-temperature storage room: The central controller detects the instantaneous signal from the temperature-sensing component, compares it with the set temperature signal, and obtains the comparison signal. The output of the instrument PID logic circuit controls the turn-on or turn-off time of the solid-state relay to adjust the heater output power. In order to achieve the purpose of automatic temperature control.

C. Impact temperature test chamber: The high and low temperature air valve is automatically controlled by the meter, and is switched between the low temperature or high temperature storage chamber, and a closed circuit air circulation system is formed respectively with the high temperature box or the low temperature box to quickly reach the target temperature of the test.

The temperature state in the test chamber is determined by the operating conditions of the heater, evaporator, and fan in the duct. The working chamber of the test box adopts the forced axial flow “scattering” type loop wind operation, which can greatly improve the parameters such as fluctuation and uniformity of equipment operation.


Product Tags:

environmental test chamber

      

temperature humidity test chamber

      
Quality Thermal Shock Environment Electrical Test Equipment IEC60068-2-3 12 Months Warranty for sale

Thermal Shock Environment Electrical Test Equipment IEC60068-2-3 12 Months Warranty Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Pego Electronics (Yi Chun) Company Limited
*Subject:
*Message:
Characters Remaining: (0/3000)